Sign in

Overview
JH
Active Projects 8 Across 6 sectors
Portfolio Budget $3.38B $124M over forecast
At Risk 3 Schedule or budget variance
Decisions Needed 3 Awaiting owner input
Overdue Actions 7 Across 4 projects
Open Risks 5 2 escalated
AI Daily Brief
Wednesday, August 27, 2026
Live

Bellyard Hotel Expansion is the highest priority item this week. The MEP coordination drawing set was flagged for revision on Monday, pushing the interior framing start by an estimated 9 days. If framing does not begin by September 5, the project falls below a 12-week float buffer required for the owner's November opening commitment. Action owner Marcus Webb has not responded to the August 22 RFI.

Stadium of the Future structural steel procurement is 6 weeks ahead of the critical path milestone, a meaningful buffer given the Jacksonville port lead times from Q1. However, the GMP contract amendment for the expanded concessions scope (+$4.2M) remains unsigned at 18 days outstanding. Kyle Taylor flagged this for this week's ownership meeting.

Presbyterian Village Athens passed its fire suppression rough-in inspection on August 25. Closeout readiness now sits at 61%, up from 47% two weeks ago. Two punch list items remain open in the memory care wing: HVAC balancing (responsible: Trane Service, due Sept 3) and nurse call system commissioning (responsible: Rauland, due Sept 10).

Recommended Actions
7 overdue
Portfolio Health
75 out of 100
Good. Three projects warrant monitoring.
Pending Decisions
View all
All Sectors Sports Commercial Hospitality Healthcare Education
Construction Phase
Project Sector Phase Location Budget Forecast Variance Completion Schedule Risks Contact
Total Milestones10Tracked this quarter
On Track5No delay
Delayed3Require attention
Ahead of Schedule1Stadium steel
Project Gantt — Scroll to explore
Hover over any bar for details
Milestone Tracker
MilestoneProjectPlannedForecastDelayStatusCritical
AI Schedule Narrative

The portfolio schedule is under pressure at two points. Bellyard Hotel Expansion has three cascading milestones at risk: MEP rough-in (9 days late), framing start (9 days), and substantial completion (13-day risk). The November owner commitment requires an immediate decision from Marcus Webb on the MEP revision authority.

Stadium of the Future is the portfolio bright spot: structural steel erection is 36 days ahead of schedule, providing meaningful buffer against the Jacksonville port's historically variable lead times.

Presbyterian Village Athens substantial completion remains on schedule for September 15 despite the nurse call commissioning shift. The 9-day slip is on a non-critical path item.

Portfolio Budget$3.38BAcross 8 projects
Current Forecast$3.50B+3.7% over budget
Total Variance+$124M4 projects over 5%
Within Budget4Under 2% variance
Budget vs Forecast by Project
ProjectBudgetForecastVariance ($)Variance (%)
AI Financial Commentary

Four of eight projects are tracking above their base budgets. The two largest variances are owner-driven scope additions. Stadium of the Future is $15.2M over budget primarily due to the expanded concessions scope addition; the GMP amendment is pending signature. Northside Cherokee Medical Pavilion added $1.8M in MEP contingency reserves as a prudent risk mitigation measure in July.

Bellyard Hotel Expansion carries the highest percentage variance at 7.7% ($7.2M over $94M base), driven by the unsigned GMP amendment for the lobby and restaurant redesign. Until the amendment is signed, this variance is not formally recognized in the owner's budget.

Three projects (Yancey Bros, One Tower Court, ABAC Campus) are within 2% of base budget. Miller Electric Center and ABAC both reflect the early CD phase where scope is still being defined.

Total Open8Across 5 projects
Escalated2Require owner action
High Severity3Flagged this week
Trend Up2Worsening
All Escalated Flagged Open
RiskProjectSeverityProbabilityStatusTrendOwnerDate
Pending3Awaiting owner input
Decided5This month
Total Logged8Across 8 projects
DecisionProjectPriorityOwnerDateStatusRationale
Total Open10Across 7 projects
Overdue4Past due date
Critical1Require immediate action
Due This Week3By Aug 31
All Overdue Open Critical
ActionProjectPriorityOwnerDue DateStatus
All Types Drawings Contracts Permits Closeout Specs
Closeout Readiness by Project
Open Closeout Items
2 blocking turnover
ItemCategoryResponsibleDueStatus
AI Closeout Analysis

Presbyterian Village Athens is the only project currently in closeout. At 61% readiness, two items remain on the critical path to substantial completion: HVAC balancing and nurse call commissioning. Both have responsible parties assigned and due dates set before the September 15 SC target.

The warranty reserve fund decision (pending Rev. Garner) must be made before SC to ensure day-one coverage is in place. IMPACT recommends the owner authorize the fund by September 5 to avoid a gap in coverage at occupancy.

Report History
ReportProjectGeneratedStatusAction
Items Tracked8Across 5 projects
Critical Risk1Bellyard elevator cabs
High Risk2Order window closing
3Ordered On Track
Lead-Time Visual Tracker
Overdue/Critical At Risk Pending Ordered/Delivered
Item Detail
ItemProjectLead TimeOrder ByStatusEscalation Risk
AI Procurement Alert

Bellyard Hotel elevator cabs are overdue for order. The 24-week lead time required order placement by August 15; the order has not been confirmed. If not placed by September 5, the elevator install milestone will slip into the punch list window, risking the certificate of occupancy. This is the single highest-risk procurement item in the portfolio.

Northside Cherokee switchgear (40-week lead time) must be ordered by August 30 to protect the MEP milestone. Current status is At Risk; the subcontractor has not confirmed the purchase order. IMPACT recommends owner escalation by August 28.

ItemProjectCategoryResponsible PartyExpiresStatusNotes
Total Open0Awaiting response
Overdue0Past due date
Answered0This month
Avg Response4dDays to close
All Open Answered Overdue Draft
RFI #SubjectProjectFromToDateDueStatus
Pending Review0Awaiting action
Approved0This month
Revise & Resubmit0Needs attention
Total0All submittals
All Pending Approved Revise Submitted
Sub #DescriptionSpec SectionProjectSubmitted ByDateStatus
Build IQ RAG Architecture

Every AI answer is grounded in real project documents. Here is the complete data flow from raw document to cited answer.

Ingest Pipeline
Runs once per document
Data Sources
Query Pipeline
Runs on every question
Why RAG Over Alternatives
Tech Stack
Team Members
Supabase Connection
Configured

Edit the SUPABASE_URL and SUPABASE_KEY constants at the top of the script section to connect to your Supabase project. Required tables: rfis, submittals, meeting_notes.

Danger Zone

Hard reset clears all locally added RFIs, submittals, and meeting notes. It does not affect Supabase data. Use this to restore the demo state after a presentation.

How Build IQ Works

Build IQ is a production AI architecture built on retrieval-augmented generation (RAG) with Supabase as the persistence layer.

Budget$1.50BBase contract
Forecast$1.512B+$12M (+0.8%)
Completion98%2 items remaining
Open Risks2Low severity
Closeout94%Ready
Project Overview
Owner
AMB Sports & Entertainment
Construction Manager
Hunt-Gilbane JV
Executive Lead
Marcus Williams
Location
Atlanta, GA
Start Date
May 2014
Substantial Completion
Aug 2017
Overall Completion 98%
Closeout Readiness 94%

Mercedes-Benz Stadium is a $1.5 billion retractable-roof sports complex in downtown Atlanta, serving as the home for Atlanta United FC (MLS) and the Atlanta Falcons (NFL). IMPACT provided development management, owner's representation, and advisory services across the full project lifecycle. The stadium features a unique retractable petal roof, a 360° halo video board, and a capacity of 71,000. Now in final operational closeout, 2 punch items target September 5 completion.

Closeout Milestones
On Track
Final Punch List Walk
Sep 1, 2026Pending
O&M Documentation Handoff
Sep 3, 2026In Progress
Warranty Register Finalized
Sep 5, 2026Scheduled
Final Closeout Report Issued
Sep 10, 2026Scheduled
Financial Summary
Base Budget
$1.500B
Forecast
$1.512B
Variance
+$12M
Variance of +0.8% is within acceptable range for a project of this scale. Primary drivers: scope additions for expanded premium club level and AV system upgrades requested by AMB during construction.
Construction Hard Costs$1.224B
Soft Costs & FF&E$188M
Owner Contingency Used$88M
Owner Contingency Remaining$12M
Open Risks
2 Open
MediumPunch list item — south plaza drainage
Owner accepted minor standing water risk; monitoring planned for fall rain season.
LowHVAC commissioning sign-off pending
Third-party commissioning agent completes final verification Sep 3, 2026.
AI Project Brief
Live

Mercedes-Benz Stadium is in final closeout at 98% completion. Budget variance of +$12M (0.8%) is within acceptable tolerance. Two low-severity risks remain: south plaza drainage and HVAC commissioning — both targeted for resolution by September 5. Marcus Williams to confirm final punch list walk by September 1. O&M handoff and warranty register finalization are the primary remaining activities. No critical schedule risks identified. Closeout readiness at 94% — on track for full project close by mid-September.

Risk Detail
ESC
At risk Decisions Overdue actions Mercedes-Benz Bellyard Schedule Budget Procurement Closeout Risks
BuildIQ AI RAG
ESC to close
Log Meeting
AI will summarize and extract action items
Add RFI
Add Submittal
Upload Document